Answer to Question #159738 in Electrical Engineering for Mina malik

Question #159738

In a three phase power system line to line fault happened between phase a and c :

A) write the fault conditions in phase domain

b) derive the fault condition in sequence domaine. show all necessary steps. it must be noted that ABC positive phase sequence has to be used

C) draw the sequence networks.


1
Expert's answer
2021-02-01T09:29:09-0500

A) "Ia = Ib = - Ic"

B) -j"\\sqrt 3 Ib1"


Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Comments

No comments. Be the first!

Leave a comment

LATEST TUTORIALS
APPROVED BY CLIENTS