Homework Answers

Math 51397 50414
Physics 44335 44333
Chemistry 40988 40988
Economics 30646 30644
Programming & Computer Science 26878 26876
English 10084 10084
Biology 8111 8109
Management 6239 6239
Engineering 6056 6056
History 3490 3489
Psychology 2129 2129
Sociology 1858 1858
Geography 1574 1574
Marketing 1443 1443
Philosophy 1001 1001
Political Science 892 891
Law 876 876
French 438 438
Other 199 199

Questions: 238 634

Answers by our Experts: 237 641

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search & Filtering

Using an array , write a C++ program that can hold ten integer input from user. Display those values on the screen , and their prompt the user an integer to search within the array , and count the number of times the item is found.



Enter 10 values in array :


1


2


3


4


5


6


7


8


8


Values in array now : 1 2 3 4 5 6 7 8 8


Enter the value to find : 8


8 was found in 2 times.


____________________________


Process excited with return value 0


Press any key continue . . .

Enter a C++ program that will help accept an input for the array size. Store the user input then display the even odd numbers.



Enter array size :: 10



Enter array elements ::



Enter arr[0] Elements :: 1


Enter arr[1] Elements :: 2


Enter arr[2] Elements :: 3


Enter arr[3] Elements :: 4


Enter arr[4] Elements :: 5


Enter arr[5] Elements :: 6


Enter arr[6] Elements :: 7


Enter arr[7] Elements :: 8


Enter arr[8] Elements :: 9


Enter arr[9] Elements :: 0



Stored Data in Array ::


1 2 3 4 5 6 7 8 9 0



Events Elements in Array are ::


2 4 6 8 0



Odd Elements in Array are ::


1 3 5 7 9

. One of your clients wants to apply for a Home Loan in the next 12 to 18 months. Few months back the client had lost his job during the COVID-19 pandemic and delayed his credit card payments. The client is worried that this may impact his credit score maintained by Credit Bureaus. Suggest a roadmap to your client to improve his credit score


A box of mass 500kg is druged along a level ground at a speed of 12metres per second.if the force of friction between the box and the floor is 1200newtons .calculate the power developed?


Design the concrete mix according to the following conditions:



Design Environment



Building frame



Required design strength = 27.6 MPa



Minimum dimension = 150 mm



Minimum space between rebar = 40 mm



Minimum cover over rebar = 40 mm



Maximum slump is required



Statistical data indicate a standard deviation of compressive strength of 2.1 MPa is



expected (more than 30 samples).



Only air entrainer is allowed.




Available Materials



Air entrainer: Manufacture specification 6.3 ml/1% air/100 kg cement. (Use maximum



or +2% air content)



Coarse aggregate: 19 mm nominal maximum size, river gravel (rounded)



Bulk oven-dry specific gravity = 2.55, Absorption = 0.3%



Oven-dry rodded density = 1761 kg/m³



Moisture content = 2%



Fine aggregate: Natural Sand



Bulk oven-dry specific gravity = 2.6

Consider a profit maximizing firm whose total cost function is given as TC=Q2 +


20Q, consumers of the firm’s products derive benefits from the good according to the


function MB=500 – 12Q. Production of the product has negative effects on the


environment approximated at Ksh. 300 per unit.


(i) Determine the efficient level of output for the firm without government intervention

13. According to a study, the price elasticity of shoes in the United States is 0.7, and the income


elasticity is 0.9.


a. Would you suggest that the Brown Shoe Company cut its prices to increase its revenue?


b. What would be expected to happen to the total quantity of shoes sold in the United


States if incomes rise by 10 percent?

11. Why do you think that whenever governments (federal and state) want to increase rev-


enues, they usually propose an increase in taxes on cigarettes and alcohol?

The design of a concrete mix requires 1173 kg/m3



of gravel in dry condition, 582 kg/m³ of sand in dry condition, and 157 kg/m³of free water. The gravel available at the job site has a moisture content of 0.8% and absorption of 1.5%, and the available sand has a moisture content of 1.1% and absorption of 1.3%. What are the masses of gravel, sand, and water per cubic meter that should be used at the job site?

12. Could a straight-line demand curve ever have the same elasticity on all its points?

LATEST TUTORIALS
APPROVED BY CLIENTS